Recent Overview
Mining cutter suction dredger (CSD) from diesel to electric drive
17 June, 2024VOSTA LMG is proud to announce that we received the order to convert a mining cutter suction dredger (CSD) from diesel to electric drive.
VOSTA LMG attending Europort 2023
28 September, 2023This year, VOSTA LMG is participating the Europort 2023, hosted in The Netherlands at Rotterdam Ahoy from November 7-10. This is a unique opportunity to connect and discover how our products can improve your dredging processes. Meet us in hall 1 - booth 1511.
VOSTA LMG participating in Weda Summit & Expo 2023
06 July, 2023This year, VOSTA LMG is participating in the WEDA Dredging Summit & Expo 2023 to showcase how our innovative products can transform your dredging operations. Mark your calendars for the WEDA Summit & Expo 2023 from July 17-20 in Las Vegas and visit us at booth 220.
150th Anniversary LMG
11 April, 2023VOSTA LMG is happy to announce that this year marks the 150th anniversary of the German part of our company, Lübecker Maschinengesellschaft (LMG). Over the past century and a half, we have grown from a small local business to a global name in dredging technology with all up and downs in between.
VOSTA LMG secures order for Dredge Automation and Side Suction Pipe Gantry Systems from Conrad Shipyard
26 April, 2021Conrad Shipyard L. L. C. has awarded VOSTA LMG Components & Services B.V. orders for a Dredge Control and Monitoring system (DCMS) and Side Suction Pipe (SSP) Gantry System. These systems will be implemented in the new 6.500 yrd3 (5.000 m3) Trailing Suction Hopper Dredge (TSHD) that Conrad Shipyard is currently building for Great Lakes Dredge & Dock Corporation (GLDD) at its Deepwater South shipyard in Amelia, Louisiana, USA. Delivery of the vessel is scheduled before the end of second quarter 2023.